Do you need an environmental impact assessment procedure for an unfired brick machine cement environmental protection brick factory?
Whether or not a project needs an EIA is based on the "Categorized Management Directory of Environmental Impact Assessment of Construction Projects" issued by the Ministry of Environmental Protection of the People's Republic of China. According to the newly promulgated "Construction Project Environmental Impact Assessment Classified Management Directory" that will be implemented on June 1, non-metallic mineral mining and product manufacturing include lime and gypsum manufacturing, stone processing, artificial stone manufacturing, and brick and tile manufacturing. All of them need to conduct an environmental impact assessment, and an environmental impact assessment report needs to be prepared. Therefore, setting up an unfired brick machine cement environmental protection brick factory requires an environmental impact assessment procedure. The EIA can be done by a qualified EIA company, which will speed up the process. The approximate process is:
1. Entrust a qualified environmental impact assessment company. To set up a non-fired brick machine cement environmental protection brick factory, you go to the environmental impact assessment company with the project approval document from the National Development and Reform Commission (or the notice to allow preliminary work) and the feasibility study report, and the environmental impact assessment company will send people to your processing site for on-site investigation.
2. The EIA company prepares the EIA report. When the EIA company compiles the EIA report, communicate with the EIA company in time to ensure the quality of the EIA of your unfired brick machine cement environmental protection brick factory.
(The EIA report mainly includes: 1. Project status analysis, 2. Regional environment overview, 3. Ambient air impact, 4. Surface water environmental impact, 5. Ground water environmental impact, 6. Acoustic environmental impact, 7. Solid waste environmental impact, 8. Environmental risk assessment, 9. Pollution prevention and control measures and their technical and economic demonstrations, 10. Assessment conclusions and improvement measures, etc.)
3. Entrusted by the Environmental Protection Agency for review. After the report comes out, it will be sent to the Environmental Protection Bureau. If there is a need for review, after the review is over, some opinions will be put forward on your construction of an unfired brick machine cement environmental protection brick factory.
4. Approval by the Environmental Protection Bureau. When you are finished, take the revised report and submit it to the local environmental protection bureau. The environmental protection bureau will still publish it. After the publicity is over, they will issue you an approval document. After you get the approval document, the EIA procedures will be considered complete.
Other documents required to run a non-fired brick machine cement environmental protection brick factory are:
1. Business pre-examination notice of enterprise name or copy of business license;
2. A copy of the legal person's ID card;
3. Project approval documents (feasibility study report approval or development and reform documents);
4. The internal floor plan of the project;
5. Lease contract or real estate certificate.